After finishing up the facelift on the outside of the house we really needed to put in some new walkways to get to the new entries we created. Of course this expanded to fixing other concrete so it all ties together and looks right! Today they started forming everything, assuming all goes well they will be pouring concrete on Friday. So if it ever rains, we'll won't be dragging mud into the house from the front yard!
![]() |
Walkway to the front door on the left and to the mud room on the right. |
![]() |
The walkway to the front door |
![]() |
Going to the mudroom and our new boulders covering our big tree stumps |
![]() |
Looking out from the mudroom door to the patio behind the garage |
![]() |
Looking back towards the mudroom |
0 comments:
Post a Comment
Note: Only a member of this blog may post a comment.